Skip to content
Genie Operators Supplemental Manual Cribbing Instructions

Plywood cribbing may be used to provide a level surface for safe boom operation. This instruction manual contains specifications for site constructed cribbing that, when used as instructed, may be considered firm and level ground. Cribbing may be used to bring  a workplace surface to within the safe limits for aerial lift operation as described in the operator’s manual.

Share Now:

Actsafe Safety Association would like to acknowledge and honour that our workplace and classrooms are located on the traditional, ancestral and unceded territory of the Qayqayt, S’ólh Téméxw (Stó:lō), Hul’qumi’num Treaty Group, səl̓ilwətaɁɬ təməxʷ (Tsleil-Waututh), šxʷməθkʷəy̓əmaɁɬ təməxʷ (Musqueam), and Stz’uminus peoples.

png-Logo_Actsafe_white-words-yellow-star

Actsafe is a not-for-profit health and safety association supporting British Columbia’s arts and entertainment industries.

© 2024 Actsafe Safety Association  |  Site Designed by North Shore Digital
Privacy Policy  |  Legal Disclaimer  |  Code of Conduct

Skip to content